CALCULATORS BY INDUSTRY

Mining & quarrying calculators

Estimate earthwork, stockpile, haul and crushing-screening quantities.

10 free tools. No signup. Methods, examples and source links on every page.

Aggregate Base Coverage

Estimate metric base volume, apply your allowance and bulk density, then round the material purchase to a supplier order increment.

Use aggregate base coverage →

Earthmoving Truck Loads

Apply an entered swell allowance to bank volume, then use both loose-volume and approved payload constraints.

Use earthmoving truck loads →

Bucket Payload Estimate

Combine nominal bucket volume, fill and loose density. Compare the estimated material mass with a limit you supply.

Use bucket payload estimate →

Excavation Volume

Calculate in-place rectangular volume, add your quantity allowance and extend an entered price per bank cubic metre.

Use excavation volume →

Earthwork Swell & Shrink

Apply separately entered bank-to-loose and bank-to-compacted factors, with a density-based mass perspective.

Use earthwork swell & shrink →

Material Stockpile Quantity

Model a pile with a constant trapezoidal cross-section and vertical ends, then apply your bulk density and unit value.

Use material stockpile quantity →

Before you use these calculations

State whether the quantity is in place, loose or compacted.

Supply relevant bulk densities, moisture and effective production data.

Geometry and cost estimates exclude geotechnical and operational suitability.

Start with the example, replace the assumptions with your measurements, then change one input to see its effect. Save or export the scenario if you need to keep its basis.

How Case calculators are built and checked →

Read practical calculation guides or browse another industry.