CALCULATORS BY INDUSTRY

Concrete & masonry calculators

Estimate concrete orders, delivery loads, masonry units and product-based coverage.

11 free tools. No signup. Methods, examples and source links on every page.

Aggregate Base Coverage

Estimate metric base volume, apply your allowance and bulk density, then round the material purchase to a supplier order increment.

Use aggregate base coverage →

Concrete Delivery Loads

Split one entered concrete volume into capacity-first truckloads. Separate physical loads, billed minimums, delivery charges and flat short-load fees.

Use concrete delivery loads →

Masonry Unit Quantity

Estimate units for one rectangular wall from net area and nominal module size, then round to whole supplier packs.

Use masonry unit quantity →

Sealant Tube Quantity

Model a rectangular joint, add your loss allowance and round the purchase to whole tubes of the entered volume.

Use sealant tube quantity →

Concrete Pour Duration

Combine your effective placement rate, setup and pauses to estimate elapsed crew time and its value.

Use concrete pour duration →

Mortar Bag Quantity

Enter the product’s masonry-units-per-bag coverage, add your allowance and round the mortar purchase to whole bags.

Use mortar bag quantity →

Paver Joint Sand

Use the coverage row for your actual pavers and joints, add an ordering allowance and round to whole bags.

Use paver joint sand →

Before you use these calculations

Start with net dimensions and the required placed quantity.

Replace example bag yields and supplier minimums with actual product data.

Compare labor, equipment and delivery as well as material price.

Start with the example, replace the assumptions with your measurements, then change one input to see its effect. Save or export the scenario if you need to keep its basis.

How Case calculators are built and checked →

Read practical calculation guides or browse another industry.