Water & constant-flow inventory
Tank Fill & Drain Time Calculator
Calculate ideal inventory-change time from simultaneous constant inflow and outflow.
Your numbers.
A clearer decision.
Inputs stay in this browser.
INPUT GROUP 01
Entered assumptions and matching units
Check the assumptions before acting on a result.
Read the method and exampleYOUR CALCULATION
Calculate ideal time for a constant-flow inventory change.
Target less starting inventory (m³)
Ideal time to target
Working capacity above the target (m³)
Illustrative inputs loaded. Replace them with your own assumptions.
How the tank fill & drain time calculator works
Net flow is inflow less outflow, while inventory change is target less start. If their directions agree, ideal time is inventory change divided by net flow. An already reached target takes zero time.
A different target cannot be reached by zero or oppositely directed net flow under these assumptions. Starting and target inventory must both fit the entered working capacity.
This is a linear inventory balance at constant measured flows, not gravity-orifice draining, pump selection, surge or overflow protection, tank design, operating control or a safety assessment.
Worked example
Moving from 20 to 80 m³ at 10 m³/h inflow and 4 m³/h outflow gives 6 m³/h net flow and 10 hours. A 50-m³ target instead takes five hours.
Sources and assumptions
The source material explains the underlying calculation or pricing structure. Entered prices, costs, schedules and scenario choices are your assumptions; this tool does not obtain supplier quotes or predict actual results.
Related calculators
Calculation methods, testing and sources · Practical calculation guides