Manufacturing & whole-unit planning
Production Capacity Calculator
Estimate whole starts and expected good-unit capacity using observed running cycle, availability and yield.
Your numbers.
A clearer decision.
Inputs stay in this browser.
INPUT GROUP 01
Entered assumptions and matching units
Check the assumptions before acting on a result.
Read the method and exampleYOUR CALCULATION
Plan conservative whole-unit output from a declared schedule and yield.
Whole good-unit planning capacity per window
Whole identical windows required
Good capacity minus required units in one window
Illustrative inputs loaded. Replace them with your own assumptions.
How the production capacity calculator works
Pool scheduled time across equal machines, multiply by availability and divide by productive-running cycle time. Floor total starts, then multiply by expected good yield and floor again for a whole-unit planning count.
Required identical production windows equal demand divided by good capacity, rounded upward. Positive demand at zero capacity has no finite count. The observed cycle already includes running-speed effects; do not apply them again.
This is pooled deterministic capacity, not separate machine dispatch or a stochastic accepted-unit guarantee. Availability and yield apply once. Scheduling constraints, correlated failures, queues and staffing must be reviewed separately.
Worked example
Eight hours on two machines at 90% availability and a 30-second cycle allows 1,728 starts. At 95% good yield, floor(1,641.6) gives 1,641 good units; 3,000 units need two windows. Four-hour windows have capacity 820 and need four windows.
Sources and assumptions
The source material explains the underlying calculation or pricing structure. Entered prices, costs, schedules and scenario choices are your assumptions; this tool does not obtain supplier quotes or predict actual results.
Related calculators