Overall Equipment Effectiveness Calculator
Derive availability, performance, quality and OEE from one consistent production period. Enter minutes for the period and seconds for the ideal cycle.
Your numbers.
A clearer decision.
Inputs stay in this browser.
INPUT GROUP 01
Production time
INPUT GROUP 02
Observed production
Check the assumptions before acting on a result.
Read the method and exampleYOUR CALCULATION
OEE relates first-pass good production at the ideal cycle to planned production time.
Availability
Performance
Quality
Overall equipment effectiveness
Production time reconciliation
| Time basis | Minutes |
|---|---|
| Planned production | 480 |
| Stops inside the planned period | 60 |
| Run time | 420 |
| Ideal time for all produced units | 350 |
| Ideal time for first-pass good units | 332.5 |
Illustrative inputs loaded. Replace them with your own assumptions.
How the overall equipment effectiveness calculator works
Use one defined process and observation period. Planned production time excludes intervals when there was no intention to produce; stop time is measured inside that planned period. Run time = planned minutes − stop minutes. Stop time cannot exceed planned time. Total and first-pass good production are whole counts, and good count cannot exceed total count.
Availability = run time ÷ planned time. Performance = ideal cycle seconds × total count ÷ 60 ÷ run minutes. Quality = first-pass good count ÷ total count. OEE = availability × performance × quality, equivalently ideal cycle seconds × good count ÷ 60 ÷ planned minutes. The displayed factors are percentages.
The ideal cycle is the process’s best achievable per-unit cycle, not its observed average. Seconds and minutes are converted before division. If ideal time for all units exceeds actual run time, the model rejects the entries rather than clamping performance to 100%. Positive production counts also require positive run time.
With zero planned time and zero production, all percentage factors are undefined and shown as dashes. With planned time but no production, OEE is zero; quality is undefined, and performance is zero only when run time is positive. A fully stopped period has undefined performance. No universal good/bad benchmark or comparison between unlike processes is implied.
Worked example
For 480 planned minutes, 60 stop minutes, a 30-second ideal cycle, 700 total units and 665 first-pass good units, run time is 420 minutes. Availability is 87.5%; performance is 350 ÷ 420 = 83.333333%; quality is 665 ÷ 700 = 95%. Fully productive good-unit time is 332.5 minutes, so OEE is 332.5 ÷ 480 = 69.270833%. Percentages are rounded only for display.
Sources and assumptions
The source material explains the underlying calculation or pricing structure. Entered prices, costs, schedules and scenario choices are your assumptions; this tool does not obtain supplier quotes or predict actual results.
Related calculators
Calculation methods, testing and sources · Practical calculation guides