Quality & operations

First-Pass Yield Calculator

Measure first-pass acceptance separately from good output recovered after rework, using mutually exclusive outcomes for one unit cohort.

49 / SEPARATE QUALITY OUTCOMES

Your numbers.
A clearer decision.

Free to use. No signup.
Inputs stay in this browser.

Starting values are illustrative. Use your own costs, rates and assumptions.

INPUT GROUP 01

Same unique-unit cohort

YOUR CALCULATION

Separate first-pass quality from output accepted after rework.

First-pass yield

92.00%

Accepted yield including rework

98.00%

Scrap share of started units

2.00%

Units accepted after rework

60

Units not yet accounted as accepted or scrap

0

Cohort outcomes

Cohort outcomes
OutcomeUnits
Accepted first pass920
Accepted after rework60
Scrapped20
Unresolved0

Keep the calculation

Saving is optional and stays on this device. Unsaved edits are not kept when you leave. CSV includes every input and the current results.

Illustrative inputs loaded. Replace them with your own assumptions.

How the first-pass yield calculator works

First-pass yield is units accepted without rework divided by units started. Accepted yield adds units later accepted after rework to first-pass accepted units, then divides by started units. Scrap rate uses scrapped units over the same denominator.

Every unit belongs to just one outcome category. Accepted-first-pass plus accepted-after-rework plus scrap cannot exceed started units; a remainder is shown as unresolved. At zero started units, all outcomes must be zero and yield percentages are unavailable.

Recovered output can improve final accepted yield while leaving first-pass yield unchanged. This cohort calculation does not count repeated rework attempts, compute rolled throughput yield, infer process capability or establish a quality guarantee. Keep cohort boundaries and acceptance criteria consistent.

Worked example

Of 1,000 started units, 920 pass without rework, 60 are accepted after rework and 20 are scrapped. First-pass yield is 92%, accepted yield including rework is 98%, scrap share is 2% and no units remain unresolved.

Sources and assumptions

The source material explains the underlying calculation or pricing structure. Entered prices, costs, schedules and scenario choices are your assumptions; this tool does not obtain supplier quotes or predict actual results.

Calculation methods, testing and sources · Practical calculation guides