Science & entered-assumption arithmetic

Cooling Tower Water Balance Calculator

Accounted makeup requirement is the sum of evaporation, blowdown, drift, leakage and overflow during one common period.

195 / COOLING TOWER WATER BALANCE

Your numbers.
A clearer decision.

Free to use. No signup.
Inputs stay in this browser.

Starting values are illustrative. Use your own costs, rates and assumptions.

INPUT GROUP 01

Entered quantities and model assumptions

Illustrative defaults are examples. Replace them with matching measurements, reviewed properties and actual quote terms.

YOUR CALCULATION

Reconcile supplied same-period water volumes.

Sum of entered loss volumes · m³

100

Measured makeup minus counted losses · m³

5

Keep the calculation

Saving is optional and stays on this device. Unsaved edits are not kept when you leave. CSV includes every input and the current results.

Illustrative inputs loaded. Replace them with your own assumptions.

How the cooling tower water balance calculator works

Accounted makeup requirement is the sum of evaporation, blowdown, drift, leakage and overflow during one common period. Unaccounted volume equals measured makeup minus that sum. The discrepancy remains signed, including when measured makeup is lower than accounted losses.

Use measured or independently supplied component volumes on compatible conditions. No evaporation coefficient or universal loss fraction is assumed. Avoid counting a loss in two categories. A discrepancy is a data/boundary check, not proof of a leak, an operating instruction or a cooling-tower treatment determination.

Quantities use the stated units and finite bounded inputs. Whole purchases round up under the documented model; cost components round half-up to cents before totals are summed. Undefined ratios stay unavailable. π and logarithms use normal numeric precision. Display rounding does not alter the entered assumptions.

Worked example

70 m³ evaporation, 20 blowdown, 5 drift and 5 leakage total 100 m³. Measured makeup of 105 m³ leaves 5 m³ unaccounted. Changing measured makeup to 100 m³ makes the discrepancy zero.

Sources and assumptions

The source material explains the underlying calculation or pricing structure. Entered prices, costs, schedules and scenario choices are your assumptions; this tool does not obtain supplier quotes or predict actual results.

Calculation methods, testing and sources · Practical calculation guides