Batch Completion Time Calculator
Estimate whole batches and synchronized parallel waves using one elapsed setup delay and a full cycle for every partial batch.
Your numbers.
A clearer decision.
Inputs stay in this browser.
INPUT GROUP 01
Batch volume and parallel capacity
INPUT GROUP 02
Time conventions
Check the assumptions before acting on a result.
Read the method and exampleYOUR CALCULATION
Plan whole batches through synchronized parallel machine waves.
Parallel processing waves
Modeled elapsed completion time (min)
Total batch machine-time (min)
Unused slots in the final batches
Units per elapsed hour
Illustrative inputs loaded. Replace them with your own assumptions.
How the batch completion time calculator works
Whole batches = ceil(required units ÷ units per batch). Parallel waves = ceil(batches ÷ identical machine count). Each machine handles at most one batch in a wave; all batches use the same cycle, including a partly filled final batch.
Elapsed time for positive demand is one setup delay plus waves times processing plus sequential handling minutes. Aggregate machine minutes count batch cycles without setup. Zero demand suppresses setup and processing; zero elapsed time makes average hourly output unavailable.
This simple wave schedule does not model queues, staggered starts, shared labor, overlapping handling, variable batch times or failures. It is separate from takt or OEE. Vorne provides production-time context; the synchronized-batch convention is this tool’s explicit planning assumption.
Worked example
1,000 units in 250-unit batches require four batches. Two machines process those in two waves. At 30 processing plus five handling minutes per batch and 20 elapsed setup minutes, completion takes 90 minutes. Increasing demand to 1,250 units requires five batches, three waves and 125 minutes.
Sources and assumptions
The source material explains the underlying calculation or pricing structure. Entered prices, costs, schedules and scenario choices are your assumptions; this tool does not obtain supplier quotes or predict actual results.
Related calculators
Calculation methods, testing and sources · Practical calculation guides