Fabrication & purchasing

Metal Stock & Cutting Cost Calculator

Compare two stock quotes for the same required parts. Include trim, saw kerf, whole-bar purchases, cutting charges and delivery.

04 / COMPARE THE QUOTES

Buy the stock.
Know the part cost.

Your measurements. Your quotes.
Free to use. No signup.

Starting prices and dimensions are illustrative.

01 / THE PARTS YOU NEED

One requirement. Two stock options.

Use equal cut lengths and compare the same material grade and cross-section. Include any allowance needed for later machining or finishing.

Planning cut convention

Reserve one full kerf and one cutting charge per produced piece. An exact stock-length part with zero trim is treated as uncut. The trim allowance includes trim-cut material loss; add trim-cut charges under other fees. Read the method

02 / SUPPLIER QUOTE A

Stock option A

A

CHARGES APPLIED ONCE PER ORDER

3 planned pieces per bar7 bars processed · 7 bars purchased$431.00 total · $21.55 per required piece

02 / SUPPLIER QUOTE B

Stock option B

B

CHARGES APPLIED ONCE PER ORDER

7 planned pieces per bar3 bars processed · 3 bars purchased$450.00 total · $22.50 per required piece

03 / THE ORDER COMPARISON

10 ft stock costs less.

$19.00difference for the required pieces

Compare entered purchase and cutting charges. Unentered labor, taxes and other costs are excluded.

QUOTE A · 10 ft stock

$431.00$21.55 per required piece

QUOTE B · 20 ft stock

$450.00$22.50 per required piece

What you buy and cut

Quantities under the planning cut convention
QuantityQuote AQuote B
Planning pieces per bar37
Bars processed73
Bars purchased73
Whole unprocessed bars00
Pieces produced2020
Production cuts charged2020
Purchased length840 in720 in
Length in required pieces600 in600 in
Kerf loss2.5 in2.5 in
Trim allowance used3.5 in1.5 in
Offcuts from processed bars234 in116 in
Whole unprocessed stock0 in0 in

Offcuts may still be useful stock. Extra whole bars bought for a minimum order are shown separately and receive no trim or production cuts.

Where the money goes

Entered charges in USD
CostQuote AQuote B
Stock material$336.00$270.00
Production cutting$30.00$30.00
Order setup$20.00$20.00
Delivery$45.00$130.00
Other charges$0.00$0.00
Total order cost$431.00$450.00
Cost per required piece$21.55$22.50

Cost per required piece spreads the whole purchase cost across the requested parts, including any minimum-order extras. No resale or scrap credit is assumed.

Planned cutting groups

Quote A
  • 6 bars × 3 pieces; 3 cuts and 29.125 in offcut per bar.
  • 1 bar × 2 pieces; 2 cuts and 59.25 in offcut per bar.
Quote B
  • 2 bars × 7 pieces; 7 cuts and 28.625 in offcut per bar.
  • 1 bar × 6 pieces; 6 cuts and 58.75 in offcut per bar.

Keep the comparison

Saving is optional and stays on this device. Unsaved edits are not kept when you leave. CSV includes the inputs, results and cut plan.

Example quotes loaded. Replace the lengths, prices and supplier charges with your own.

Planning yield reserves a full kerf per produced piece. It is not a maximum-fit or mixed-length optimization.

Use your chosen cost in a job quote

How stock quantities and cutting costs are calculated

Enter one required cut length and the number of pieces needed. Compare two stock lengths or supplier quotes for the same material, alloy and cross-section. Include any later machining or finishing allowance in the required cut length. All lengths use the same selected unit: inches or millimeters.

For each option, the planning yield is the stock length minus the total end allowance, divided by the cut length plus one full saw kerf per piece. Round down to whole pieces. Kerf is the material removed by a cut; it is different from a supplier's dimensional tolerance.

Planning pieces per bar = floor((stock length − end allowance) ÷ (cut length + kerf))

This conservative rule reserves a separating cut for every produced piece. It does not reuse a final stock end as an additional finished face. One exception is a complete stock bar that exactly matches the required length with zero end allowance: it is supplied uncut, with no modeled piece-cut charge. This is a purchasing model for equal-length cuts; mixed-length nesting and machine-specific production plans need separate review.

Bars needed = ceil(required pieces ÷ planning pieces per bar)
Bars purchased = max(bars needed, minimum bars ordered)

Only the required pieces are produced. Extra whole bars bought for a minimum order stay unprocessed. End allowance is reserved once for each processed bar and includes any material lost while trimming. Offcuts from processed bars are shown separately from saw loss and unused whole bars; the calculator does not assign them a resale or scrap credit.

Total purchase cost = purchased bars × price per bar + modeled piece cuts × fee per cut + setup + delivery + other charges

Cost per required piece divides the entire purchase cost by the number of pieces you need, so it includes any minimum-order overbuy. Each extended monetary charge rounds to cents before the total is added. Tax, labor, deburring and special services are included only if entered. Trim-cut fees belong in setup or other charges; the piece-cut count does not infer extra trimming passes.

Worked example: twenty 30-inch pieces

Both illustrative quotes allow 0.5 inches of unusable end length per processed bar and a 0.125-inch kerf for each piece cut. No minimum bar quantity is entered. These figures illustrate the method; use your actual supplier and cutting-process assumptions.

Illustrative whole-bar quotes in USD
Quantity or costOption A: 120-inch barsOption B: 240-inch bars
Planning pieces per barfloor(119.5 ÷ 30.125) = 3floor(239.5 ÷ 30.125) = 7
Bars needed for 20 pieces7 bars3 bars
Material purchase7 × $48 = $3363 × $90 = $270
Piece cutting charge20 × $1.50 = $3020 × $1.50 = $30
Setup and delivery$20 + $45$20 + $130
Total purchase cost$431$450
Cost per required piece$21.55$22.50

Option B has a lower material charge but costs $19 more after its entered delivery fee. Option A processes six bars into three pieces each and one bar into two pieces. Option B processes two bars into seven pieces each and one bar into six pieces. Neither plan produces an unwanted twenty-first piece.

Sources and quote assumptions

Dalloway Precision's bar-stock guide explains how kerf, finishing allowance and unusable bar ends affect whole-piece yield. Lennartz's saw-blade specifications distinguish cutting widths, supporting a process-specific kerf input. No blade width in this example is a universal recommendation.

Online Metals' cut-to-size service illustrates that cutting may be included in the price, while its processing services include separately quoted services. Supplier cut tolerances also need to meet the required piece specification. Use the complete quote and enter a fee as zero when it is already included elsewhere.

Metal stock comparison questions

Does a longer bar always cost less per piece?

No. Whole-piece yield, the final partially used bar, minimum quantities, handling and freight can change the result. The comparison evaluates your two entered quotes; it does not search every available stock length or supplier.

Can the remaining metal be used on another job?

Possibly. Offcuts and unprocessed whole bars are reported without a credit. Their usefulness depends on condition, material traceability, dimensions and future work. Treat them separately from kerf and end allowance lost during processing.

Are all supplier cutting charges a flat fee per piece?

No. Suppliers may include cuts in the stock price, quote a minimum service charge, or price by time, section size or bundle. The modeled piece-cut fee is a simple entered rate. For a quoted total cutting charge, use a zero per-cut fee and enter that total in other charges instead.

What if one option cannot produce the requested cut length?

That option is marked as unable to fit under the entered allowances, and no misleading zero-price offer is shown. The other option can still be examined. A cost saving is calculated only when both options can fulfill the same quantity.

What happens when I enter zero required pieces?

No stock is ordered and no cutting or fixed fees are applied, including any minimum order. Cost per piece is left blank because there are no required pieces to divide the cost by.

How does this feed into a job quote?

Use the selected purchase cost in the Job Quote & Cost Overrun calculator. Add any cutting or handling labor that has not already been included. Avoid counting the same supplier fee twice, then use the Project Deposit & Cash Gap calculator to plan when payment for the stock will be due.