Staffing & sourcing

Hire vs Subcontract Cost Calculator

Compare committed paid-hour hiring costs with subcontracted productive hours, while checking the hiring option has enough productive capacity.

90 / COMPARE LABOR COMMITMENTS

Your numbers.
A clearer decision.

Free to use. No signup.
Inputs stay in this browser.

Starting values are illustrative. Use your own costs, rates and assumptions.

INPUT GROUP 01

Same-period labor requirement

INPUT GROUP 02

Hiring commitment

INPUT GROUP 03

Comparable subcontract scope

YOUR CALCULATION

Hiring has the lower entered period cost within its capacity.

Committed hiring cost for the period

$47,000.00

Subcontract cost for required hours

$50,500.00

Hiring productive-hour capacity

1,020 hr

Hiring capacity minus required hours

20 hr

Subcontract cost less hiring cost if feasible

$3,500.00

Continuous equal-cost required hours

930 hr

Cost intersection only; check against productive-hour capacity.

Keep the calculation

Saving is optional and stays on this device. Unsaved edits are not kept when you leave. CSV includes every input and the current results.

Illustrative inputs loaded. Replace them with your own assumptions.

How the hire vs subcontract cost calculator works

Hiring cost is all committed paid hours times loaded employer hourly cost, plus the one-time period cost. Productive-hour capacity is paid hours times productive percentage. Required hours above that capacity make the hiring comparison infeasible; the cost alone does not solve that shortfall.

Subcontract cost is required productive hours times the entered rate plus its fixed period cost. Hiring saving is subcontract cost minus hiring cost only when hiring capacity covers the need. Fixed commitments remain even at zero required hours. The continuous cost-line intersection must also fall within hiring capacity to be useful.

Use consistent scope and a defensible fully loaded employer rate. The intersection is a cost-line comparison, not an exact cent-rounded switch threshold. Worker classification, employment law, overtime, availability, quality and operational scheduling are not determined by this calculator.

Worked example

Hiring 1,200 paid hours at $35 plus $5,000 costs $47,000. At 85% productive time it provides 1,020 productive hours, covering the 1,000 required. Subcontracting costs $500 plus 1,000 × $50, or $50,500. Hiring saves $3,500 within capacity. A $55 subcontract rate makes that saving $8,500.

Sources and assumptions

The source material explains the underlying calculation or pricing structure. Entered prices, costs, schedules and scenario choices are your assumptions; this tool does not obtain supplier quotes or predict actual results.

Calculation methods, testing and sources · Practical calculation guides