Utilities & billing
Commercial Electricity Bill Calculator
Model one billing period with two sequential energy tiers, an entered billable demand, one fixed charge and a stated tax rule.
Your numbers.
A clearer decision.
Inputs stay in this browser.
INPUT GROUP 01
Billing-period energy tiers
INPUT GROUP 02
Other entered bill components
Check the assumptions before acting on a result.
Read the method and exampleYOUR CALCULATION
Assemble an entered two-tier energy, demand and fixed-charge bill.
Second-tier energy · kWh
Tiered energy charge
Entered billable demand charge
Tax on modeled subtotal
Modeled total bill
Total bill / energy · currency/kWh
Illustrative inputs loaded. Replace them with your own assumptions.
How the commercial electricity bill calculator works
First-tier kWh is the smaller of imported energy and the first-tier allowance. Remaining kWh uses the second-tier rate. The threshold applies once to the whole billing period. Each tier charge rounds half-up to cents before they are summed.
Demand charge = entered billable kW × demand rate, rounded separately. Add the separately rounded fixed fee. Tax is the entered percentage of the full rounded subtotal, rounded to cents and added to get total bill. Total bill divided by energy is unavailable at zero kWh; fixed and demand charges can still remain.
This is an entered-term bill scenario, not a utility-rate lookup. Billable demand must already reflect the actual interval rules, ratchets, minimums and power-factor treatment. Time-of-use calendars, exports, special taxes, exclusions, further tiers and credits are omitted. Confirm that taxing the whole modeled subtotal matches the intended comparison. SAM documents the broader range of actual tariff components.
Worked example
12,000 kWh with a 5,000 kWh first tier costs 600 at 0.12/kWh and 700 at 0.10/kWh. Billable demand of 40 kW at 15/kW adds 600. A 50 fixed fee gives 1,950 before tax; 5% adds 97.50 for a 2,047.50 total. At 6,000 kWh with the other terms unchanged, total is 1,417.50.
Sources and assumptions
The source material explains the underlying calculation or pricing structure. Entered prices, costs, schedules and scenario choices are your assumptions; this tool does not obtain supplier quotes or predict actual results.
Related calculators
Calculation methods, testing and sources · Practical calculation guides